CevelarBenchmark UN 38.3 · 2026
BENCHMARK 2026 · UN 38.3 TESTING SERVICES · Q4 2026

Cost structure and interpretation of requirements in UN 38.3 battery pack testing

A comparison of leading test laboratories quoting against one identical specification: prices, cost drivers, lead times and the interpretation of standard requirements for the lithium-ion traction pack LOR‑BP‑16S7P‑R1.

Reference test item LOR-BP-16S7P-R1
REFERENCE TEST ITEM LOR-BP-16S7P-R1 · FICTITIOUS
3.2×
price spread for the same test item, €9,000 to €29,000
−50%
expected price with a full comparison instead of a single quote
+21%
additional costs outside the quoted total, priced example from the study
PARTICIPATING TEST LABORATORIES
Batteryuniversity
Kiwa Primara
TÜV SÜD Battery Testing
CEVELAR WHITEPAPER · PUBLIC EDITIONAS OF 29 OCTOBER 2026

The study at a glance

01 · Executive summary

Key findings of the benchmark

Leading test laboratories quoted one identical test item against the same specification and response template. The results show that a supposedly standardised test scope varies considerably in price, scheduling and technical interpretation.

price factor between minimum and maximum for an identical scope
4.6×
price factor for T.7 overcharge, the highest variance of any line item
3
different assessments of whether IEC 62133-2 applies to an 11.1 kg pack
01

Significant price variance for the same test item.

Quotes for the complete UN 38.3 pack programme range from €9,000 to €29,000, with a median of €18,000. That is a factor of 3.2.

02

T.1 to T.5 drive cost, T.7 drives variance.

The T.1 to T.5 test sequence accounts for 60 to 77% of the quoted total. T.7 overcharge shows the highest relative variance, a factor of 4.6 (€1,500 to €6,960).

03

Inconsistent interpretation of standard requirements.

There are three different assessments of whether IEC 62133-2 applies to an 11.1 kg pack. Most laboratories that addressed the point require cell-level evidence from T.6 and T.8 before issuing a certificate.

04

Quoted price and project cost diverge.

Flat fees, adapters, witness testing, disposal and dangerous-goods transport are mostly not part of the quoted totals. A reliable comparison has to look at the total cost of testing.

05

Lead times and test durations lack transparency.

The earliest start dates differ by three calendar weeks, stated durations range from 21 to 39 working days, and they are calculated on different bases.

Position of the quotes · total UN 38.3 pack programme, net
MEDIAN €18,000ABCDE€0€8,000€16,000€24,000€32,000
02 · Study design

A standardised request for quotation makes the quotes comparable

Price comparisons for battery testing only hold if the scope is defined the same way for everyone. The test item, the test scope and the response structure were therefore fixed for all laboratories.

Reference test item

DESIGNATIONLOR-BP-16S7P-R1, traction pack for e-scooters
CONFIGURATION16S7P, lithium-ion
ELECTRICAL57.6 V · 33.6 Ah · 1,935 Wh
MASS11.1 kg, at most 11.8 kg
CLASSIFICATIONsmall rechargeable battery, ≤ 12 kg
SAMPLES16 packs: 8 for T.1–T.5, 8 for T.7

Manufacturer and application are fictitious. Specification LOR-LH-R60-2026-001 defines every technical parameter, so each laboratory quoted on the same basis.

Scope

UN 38.3, complete pack programme
T.1 to T.5 and T.7, half of the samples new and half after 25 cycles, including pre-conditioning and test summary
IEC 62133-2, optional
only where the laboratory considers it applicable to the test item
Not included
cell tests T.6 and T.8, UN R136, EN 50604-1, EMC
Terms
net prices, delivered to the laboratory, protection circuit active, accredited edition stated, deviations listed as assumptions

Survey

test laboratories in Germany with UN 38.3 pack testing capability
Oct 2026
survey period 12 to 28 October 2026
100%
of the evaluated quotes complete and in the same structure, with consent to anonymised publication

Laboratories are anonymised with fixed letters. The letters reveal neither identity nor ranking.

Participating test laboratories

These laboratories took part with a quote and agreed to be named. Further laboratories took part anonymously. The logos are not linked to any lab letter.

Batteryuniversity
Kiwa Primara
TÜV SÜD Battery Testing
03 · Reference test item

A fictitious traction pack with realistic key data

Manufacturer and pack are invented. Cells, mass, housing and connectors match a typical traction pack for e-scooters. All laboratories quoted on the same drawing and the same data sheet.

LOR-BP-16S7P-R1

Visualisation of the reference test item LOR-BP-16S7P-R1, illustrative.

VentChargeDischarge4 × M6 · 320150198TOP VIEWSIDE VIEW112372

Dimensions in mm per specification LOR-LH-R60-2026-001. Dashed: M6 mounting points in the base plate, position schematic.

HOUSINGAlMg3, 3 mm base plate, bolted lid, perimeter seal
INGRESSIP67, connectors mated or with series cap
MOUNTING4 × M6 on 320 × 150 mm, torque 8 N·m
PRESSURE RELIEF1 vent membrane on the lid
CONNECTORSseparate discharge and charge, on the end face
COOLINGnone, no coolant
RELEVANCE FOR TESTING

For vibration and shock the pack is mounted on the table by its four M6 points, and the vent membrane stays uncovered in all tests. If the mass including the test adapter exceeds 12 kg, the pack counts as a large battery and the number of samples changes.

04 · Quoted prices

A €20,000 price gap for an identical scope

The lowest quote is 50% of the median, the highest 161%. All quotes refer to the same test item, 16 samples and an identical test scope.

€0€8,000€16,000€24,000€32,000Median €18,000Lab A€18,000Lab B€14,261 + €945 flat feeLab C€9,000Lab D€29,000Lab E€19,445
total UN 38.3 pack programme, netflat fee outside the quoted totalMedian
€17,941
arithmetic mean of the quoted totals
€1,125
median per sample, based on 16 packs
€562–€1,812
range per sample
ASSESSMENT

The spread reflects differences in capacity utilisation, equipment and risk assessment between laboratories. For buyers this means a single quote does not indicate the market price. Without a structured comparison, costs can be up to 3.2 times higher.

05 · Cost structure

T.1 to T.5 drive cost, T.7 drives variance

The T.1 to T.5 test sequence accounts for 60 to 77% of the quoted total. The highest relative spread, however, is in the smaller line items, above all T.7 overcharge.

Lab A€13,800Lab B€10,336Lab C€6,500Lab D€18,300€6,960€3,170Lab E€11,733€5,224
T.1 – T.5T.7 overchargePre-conditioning, 25 cyclesReport & test summary
Line itemMinimumMedianMaximumFactor
T.1 – T.5
altitude, thermal, vibration, shock, short circuit · 8 packs
€6,500€11,733€18,3002.8×
T.7 overcharge
8 packs, 4 new and 4 after 25 cycles
€1,500€2,000€6,9604.6×
Pre-conditioning
25 cycles on 8 packs
€1,000€1,300€3,1703.2×
Report & test summary
test report and 38.3.5 summary
€0€570€9391.6×

Some laboratories quote T.1 to T.5 and T.7 as one item across both sample halves, or include the report and test summary in the test price; the factor for that line item only covers separately priced quotes.

06 · Start dates and lead times

Lead times and test durations lack transparency

In many development programmes, test capacity is the critical path. Earliest start dates and test durations differ considerably and are calculated on different bases.

01020304050working daysEARLIEST START · AS OF OCT 2026Lab A21CW 45Lab B32 (45 calendar days)CW 47Lab C26immediatelyLab D39immediatelyLab E37.5CW 45

Inconsistent bases

Some quotes state calendar days from goods receipt to report, some the sum of individual line items without parallel test runs, some a total below that sum. Calendar days are converted here to working days at 5/7. The figures only become comparable with a binding schedule.

Start date as a planning factor

As of October 2026, the earliest start dates range from immediate availability through CW 45 to CW 47, and up to CW 50 for staggered test runs. Some quotes offer a start without lead time. At a similar price, an earlier start takes several weeks off the project plan.

07 · Interpretation of standards

One specification, different interpretations

Any deviation from the defined scope had to be stated as an assumption. These assumptions show that laboratories assess identical requirements differently.

AssumptionLab ALab BLab CLab DLab E
Accredited to 38.3 Rev. 8YesYesYesYesYes
Classified as small battery ≤ 12 kgYesYes, up to 12.0 kg weighedYesYesYes
25 cycles as separate line itemYesYesYesYesYes
Protection circuit stays activeYesYesYesYesYes
Can be quoted without cell reportNo, T.6/T.8 firstQuote yes, certificate noYesYesNo, T.6/T.8 first
Adapter includedYesYesNo, extra (not priced)YesYes
Witness and disposalextraextra, witness €248/hextraextraextra
Flat fees outside the totalnoneproject handling €945nonenonenone
IEC 62133-2 for 11.1 kgnot offerednot offered, 6 kg limitoffered
€8,000
offered
€9,490
not applicable
as specifieddeviation or additional servicenot stated in the quote
CELL EVIDENCE

Most laboratories that addressed the point only issue the pack certificate after passed cell tests T.6 and T.8. Without that evidence, the project needs one more complete test run.

IEC 62133-2

Laboratories disagree on whether the standard applies to an 11.1 kg vehicle pack: some quotes include the test (€8,000 and €9,490), others do not offer it, limit it to 6 kg or consider it not applicable.

08 · Historical market reference

Quotes from 2022 and 2023 were spread wider than in 2026

Same line items, different test items: €5,900 to €47,550. The 2026 study, with one test item, ranges from €9,000 to €29,000, so the years are not shown on one axis. Quotes only become comparable once they are calculated for the same test item. This normalisation is part of Cevelar Arc, our cost- and project-optimised delivery of test campaigns.

€0€10,000€20,000€30,000€40,000€50,000H2€5,900H3€9,250H4€11,800H1€16,540H5€32,530H6€47,550
UN 38.3 price as quotedadded to match the study scope
Ref.YearTest item and scope as quotedQuoteNormalisedAdded
H12022Pack, 50 V / 50 Ah, 15 kg · T.1–T.5, T.7, report · cycling by customer€15,240€16,540+ pre-cond. €1,300 ¹
H22022Pack, 25.9 V / 36.3 Ah, approx. 0.9 kWh · T.1–T.5, T.7, report · cycling by customer · certificate €390 extra€4,600€5,900+ pre-cond. €1,300 ¹
H32022Pack, 55.2 V, 9.5 kg · T.1–T.5, T.7, report · cycling by customer€7,950€9,250+ pre-cond. €1,300 ¹
H42023Pack, 58.8 V, 17.5 kg · T.1–T.5, T.7, report · cycling by customer€10,500€11,800+ pre-cond. €1,300 ¹
H52022Pack, 4 samples, data not stated · T.1–T.5, handling, report · without T.7€24,730€32,530+ pre-cond. as quoted €5,800; T.7 €2,000 ¹
H62022Pack 18S10P, 75.6 V, 20 kg · T.1–T.5 incl. report, T.7€29,610€47,550+ pre-cond. as quoted €17,940
H72023HV module, 50.4 V, 37 kg · T.1–T.5 incl. pre-conditioning and disposal · without T.7€36,500n/atest item class not comparable
H82023Pack, 55.2 V, 497 Wh, 9.5 kg · IEC 62133-2 together with UN 38.3 test cycle€22,130n/aUN 38.3 not priced separately
H92023Pack, 50.4 V, 2.4 kWh, 17.5 kg · T.5 short circuit only, 1 sample€1,435n/asingle test

¹ Added at the 2026 study median for this line item. Other additions are taken from the respective quote.

ASSESSMENT

Normalised to the study scope, the 2022 and 2023 quotes had a median of €14,170, 21% below the 2026 median of €18,000, with a much wider spread. This does not show a price trend, because mass, sample count and test scope of those test items differ. The figures do work as a budget range for similar packs.

09 · Value of comparison

A structured comparison cuts the expected price by 50%

A buyer who requests a single quote pays the market average on expectation. Every additional comparable quote lowers the expected best price. The calculation uses every combination of the quotes in this study, all for an identical scope.

Expected best price by number of quotes requested

0€5,000€10,000€15,000€20,0001 quote€17,9402 quotes€13,420−€4,5203 quotes€11,480−€6,460Full comparison€9,000−€8,940
expected difference between a single quote and a full comparison, per test programme
3 weeks
difference in earliest start, immediately to CW 47 (as of October 2026)
18 WD
difference in test duration, 21 to 39 working days
PREREQUISITE

The saving only applies if every laboratory quotes the same test item with the same number of samples and states its assumptions, as in this study. Otherwise you compare different services. The calculation assumes the contract goes to the lowest quote.

CEVELAR ARC

This comparison for your test programme

Cevelar Arc sends one consistent request for your test item to several accredited laboratories, compares the quotes on total cost of testing and schedule, and runs the test campaign through to the report. Optimised for cost and project, with one point of contact. cevelar.com/arc

10 · Planning figures

Planning figures for UN 38.3 pack testing in 2026

Reference values for budget and schedule of a traction pack ≤ 12 kg, derived from the quotes in this study. Stated per pack and per sample so they transfer to your own programme.

Planning itemBasisMedianRange
T.1 – T.5 test sequenceper pack€1,467€812 – €2,288
T.7 overchargeper pack€250€188 – €870
Pre-conditioning, 25 cyclesper pack€162€125 – €396
Report and test summaryper programme€570included – €939
UN 38.3 programme, totalper sample€1,125€562 – €1,812
IEC 62133-2, 11.1 kg packper programme, where offered€8,745€8,000 – €9,490
Test durationworking days32 WD21 – 39 WD

Schedule from request to test report

02468101214WEEKS FROM REQUESTRequest and quotesLead time to startTesting and reportRequest to report6.5 wk13.1 wk
shortest path in the studyadditional weeks up to the longest path
BUDGET FOR ADDITIONAL COSTS

In the quote that states an hourly rate, the project flat fee and one day of witness testing add 21% (€2,929). Disposal, dangerous-goods transport and missing cell evidence are charged on top but usually have no price in the quote. Ask for these items before awarding the contract.

BUDGET FOR TIME

All samples must be available at the start of testing, and the T.6 / T.8 cell evidence often earlier. A missing cell report adds one complete test run to the programme.

11 · Recommendations

Total cost of testing, not the quoted price

The quoted totals are consistent in themselves. Actual project costs are usually higher, because significant cost items sit outside the quoted total or are not priced.

Cost items outside the quoted total

Project flat feesoccasionally, €945, listed separately
Adapters and mating connectorsoccasionally extra, not priced
Witness testingThe client or an appointed expert attends the test at the laboratory. Not included in any quote, occasionally with an hourly rate (€248/h)
Disposalnot included in any quote, charged by weight or effort
Dangerous-goods transportdelivery and return never included in the test price
Cell evidence T.6 / T.8required for the certificate by most laboratories
16 samplesbuilt and supplied by the customer

Checks before awarding the contract

01

One definition of the test item. Are mass, classification, charge parameters and fixture specified identically for all bidders?

02

Cell evidence. Are T.6 and T.8 cell-level results available?

03

Complete costs. Are flat fees, adapters, witness testing, disposal and transport priced?

04

Schedule basis. Is the duration stated in calendar days from goods receipt or as the sum of individual line items?

05

Scope of standards. Is it clear whether additional standards such as IEC 62133-2 apply in the target market?

12 · Cevelar

One point of contact from request to test report

This study shows what a consistent request for quotation delivers: comparable quotes within 16 days, price differences of up to a factor of 3.2 made visible, and additional costs, schedules and interpretation of standards laid open. Cevelar does exactly this for your test programme.

01

Test plan

mandatory tests from specification and standard, before requesting quotes

02

Request for quotation

one test item, one specification, one response structure

03

Comparison

total cost of testing, schedule and interpretation of standards

04

Booking and logistics

samples and slots, in parallel rather than one after another

05

Evidence

one report; testing and certificate by the accredited laboratory

QUOTE CHECK AGAINST THE BENCHMARK

Do you have a quote for UN 38.3?

We will place it against this benchmark, free of obligation: price per line item, additional costs outside the total, schedule and interpretation of standards. You will know where your quote stands in the market and which questions are worth asking. [email protected]

Have your quote assessed

Cevelar Arc

Cevelar Arc delivers test campaigns optimised for cost and project: from specification through test plan and request for quotation to booking, sample logistics and one joint report. The contract goes to the laboratory that fits the test item, the schedule and the total cost. cevelar.com/arc

Nils FlagmeierManaging Director
[email protected]
Max BeitlerManaging Director
[email protected]