Requirements
Every requirement needs an ID, owner and verification method, not a paste into Excel.
Automotive SPICE · Traceability
ASPICE assesses process maturity and bidirectional traceability, not only green lab results. If Spec → Requirement → Test → Evidence breaks, audit risk remains.
Context
Automotive SPICE scores process maturity and bidirectional traceability, not green lab results alone. The chain spec, requirement, test, evidence has to hold both ways. If it breaks, audit risk remains.
Typical gaps in battery programmes: free text without an ID, a standard without a section, OEM changes only in email, Excel plans without a spec page. Cevelar mints stable IDs from the source. Related: IEC 62619, validation planning.
Process hits
Every requirement needs an ID, owner and verification method, not a paste into Excel.
Procedures must cite the requirement and acceptance criterion they close.
OEM deltas belong in the same chain, not only in mail threads.
Assessors want the path back to the spec page, not a screenshot of a green cell.
Findings board
In battery and BMS programs the same breaks show up again and again, often after the lab is already booked.
Checklist
| Spec signal | Plan question | Risk if missing |
|---|---|---|
| REQ without ID | Can we baseline and re-verify after change? | Finding / rework |
| Norm without section | Which procedure closes which requirement? | Over- / under-testing |
| OEM annex / mail delta | Is it in the same ALM chain? | Silent scope drift |
| Pass/fail without source link | Why does this test exist? | Audit risk despite green labs |
For heads of validation
Contact
Cevelar extracts structured requirements, maps norms and builds test plans with source-level traceability, EU-hosted for IP-sensitive programs.
FAQ
Traceability before the assessment starts.
ASPICE requires traceable processes and bidirectional traceability between requirements, design and tests. For battery validation that means spec requirements must stay evidencable through to the test method and the report.
Free-text requirements without IDs, standard references without section numbers, OEM changes only in email, and Excel test plans with no pointer back to the spec page.
Cevelar produces structured requirements from OEM specs with source and clause references, as the basis for auditable test plans and ALM export. EU-hosted for IP-sensitive programmes.