What “plan battery testing” actually means
A battery test plan is the matrix of required tests (UN 38.3, IEC 62619, OEM, often R100 or ISO), DUT level, sequence, sample counts and lab capacity. Without that matrix the programme books isolated tests and finds gaps in the audit.
Test houses such as FEV, Fraunhofer or Kiwa need a defined procedure, a sample and an acceptance criterion. The lab does not invent that. The plan does. Cevelar builds the plan from the spec. Arc can run the campaign through accredited institutes.
Blocks every pack plan has to carry
- UN 38.3 for transport.
- IEC 62619 for industrial safety.
- OEM and customer tests (vibration, salt spray, life), often harsher than the standard.
- EU 2023/1542 and the battery passport once fields need evidence.
The expensive gap: two institutes run the same pulse, one required test is missing because it lived in an email. Traceability to the spec page prevents that.