Use case · Validation

Make battery validation planable

The most expensive mistakes in battery validation happen before the lab: missed requirements, missing coverage, conflicts between standard and spec sheet. Cevelar finds them early and derives a defensible test plan — so the lab campaign runs once, not three times.

  • Coverage before the lab
  • Gaps early
  • Audit-ready

Impact

Run the lab campaign once.

Fewer duplicate tests Complete plan before booking
Less rework Gaps before the audit, not in it

Roles

Test lab vs. Cevelar

Test lab (FEV, Fraunhofer, Kiwa …)

  • RoleRuns the tests
  • InputNeeds a complete test plan
  • RiskRework when the plan has gaps

Cevelar

  • RolePlans & secures coverage
  • OutputA test plan that forgets nothing
  • EffectComplements the lab, doesn't replace it
  1. Complete? Is every obligation from the spec sheet captured in a testable requirement?
  2. Covered? Does every requirement have a test case — or does a gap stay clearly flagged?
  3. Conflict-free? IEC 62619 vs. UN 38.3 vs. OEM stress profile — avoid duplicate tests.
  4. Provable? Is traceability ready for audit and ASPICE before anyone asks?

For heads of validation

Coverage is not a feeling.

Early gap and conflict detection, cost and sequence estimates for the lab campaign, and export for Polarion, Jira, or audit. Cevelar delivers this from the spec, EU-hosted — as the planning layer ahead of your test houses.

Access

Check coverage on a real spec.

Start the demo or book a founder call. Design-partner phase, we reply personally.