Six ways to make coverage visible
Validation teams often book the lab before the spec sits cleanly on tests. These use cases show the same core in six cuts: spec to plan, requirements management with and without an ALM, rail planning beside DOORS, coverage before booking, flow in three steps.
Test plan from OEM spec sheet is the core: free text and tables become requirements with ID, standard reference and acceptance. Requirements management shows how Cevelar runs beside Polarion/Jira as a coverage layer. Introduce RM is the greenfield path without an ALM — with an in-car assistant example. Rail validation planning is for teams that already keep requirements in DOORS: which test must be re-run after a change, which evidence still holds. Battery validation keeps the eye on cell/module/pack and mandatory standards before samples hit the institute. Validation planning is the operating flow, including Arc when parallel institutes are needed.
Standards the plan has to carry live under Standards.