From spec sheet to test plan
An OEM spec mixes prose, tables, translations and standard references. Validation teams read it line by line into Excel. The expensive failure is not a lab fail. It is a sentence that never became a requirement with an ID.
Cevelar reads PDF, DOCX or XLSX, splits sentences into obligations, attaches clauses (UN 38.3, IEC 62619, OEM) and flags what has no test case. The plan is the input for lab booking and for Arc.
What gets lost when it stays manual
- One sentence, two languages, two obligations. The second sits after the semicolon.
- A standard without a section. “Per UN 38.3” is not traceability.
- OEM hardness only in email. The rig never sees it.
More on the flow: validation planning in three steps.